ADMINISTRATIVE HANDBOOK FOR PVPPS

STRATEGIC VISION DOCUMENT

PVS BLOOM TRIGGERED MW

PVPP 7

  • Location of the PVPP: Industrial Area of Tertenia (OG)
  • Peak power: 768 kW
  • Area owned by: Industrial Consortium of Tertenia (OG)
  • Type of investment (private, public, leasing, mortgage…): Private leasing
  • Kind of support given by by PP2: Support to the municipality for the administrative procedure and economic study, Support to the PV company for the redaction of Feasibility study.
  • Volume of investment: € 2.534.400,00
  • Key turned in the month of: 18/12/2009
  • Prevision of further RES investments around the area: Unknown
Municipality of Tertenia, 1,718 MW (two plants : 949,9 kW and 768 kW), on the industrial area. The authorization for the installation o PV plant through a SUAP have been concluded at the beginning of 2009 also with the support of PP2, in the framework of PV in Bloom. Works began in September 2009 and actually the PV plants are connected to the electrical grid. The last PV plant has been connected the 18th Dicember 2009. PEPS support consisted in delivering PVPP project information, involving the local municipality in order to have the Letter of Intent, networking with the technical officer of the commune and with the company owner of the plant in order to know the work start up time and procedures. PEPS engagement, at the time, was also to realise and give to the municipality, for free, the pre feasibility study. PEPS engagement has been also to give to the community, at the end of the project, the works results of PV IN BlOOM project. The feasibility study has been promised in order to demonstrate the potentiality of the community territory.

PVPP 6

  • Location of the PVPP: Industrial Area of Tertenia (OG)
  • Peak power: 949,9 kW
  • Area owned by: Industrial Consortium of Tertenia (OG)
  • Type of investment (private, public, leasing, mortgage…): Private leasing
  • Kind of support given by by PP2: Support to the municipality for the administrative procedure and economic study, Support to the PV company for the redaction of Feasibility study.
  • Volume of investment: € 3.134.670,00
  • Key turned in the month of: 18/12/2009
  • Prevision of further RES investments around the area: Unknown

PVPP 5

  • Location of the PVPP: Industrial Area of Ulà Tirso (OR)
  • Peak power: 1605,3 kW
  • Area owned by: Industrial Consortium of Ulà Tirso (OR)
  • Type of investment (private, public, leasing, mortgage…): Private leasing
  • Kind of support given by by PP2: Support to the municipality for the administrative procedure and economic study, Support to the PV company for the redaction of Feasibility study.
  • Volume of investment: € 3.825.720,00
  • Key turned in the month of: 21/04/2011
  • Prevision of further RES investments around the area: Near the TERNA substation is during the link phase a PV Plant of 1 MW circa

Municipality of Ula Tirso, 5,413 MW (three plants  : 1508,7 kW; 2299,2 kW and 1605,3 kW), on the industrial area. Soil was very high polluted and there was problems for the soil characterisation. It was necessary two years for the authorisation also for lack of map of the area. Works began in September 2010 and actually the PV plants are connected to the electrical grid. The last PV plant has been connected the 29th April 2011 . Works to build the plant have been authorised the 29/10/2009. PEPS support consisted in delivering PVPP project information,  involving the local community in order to have the Letter of Intent, networking with the technical officer of the commune and with the company owner of the plant in order to know the work start up time and procedures. PEPS engagement, at the time, was also to realise and give to the community, for free, the pre feasibility study. PEPS engagement has been also to give to the community, at the end of the project, the works results of PV IN BlOOM project. The feasibility study has been promised in order to demonstrate the potentiality of the community territory.

 

PVPP 3

  • Location of the PVPP: Industrial Area of Ulà Tirso (OR)
  • Peak power: 1508,7 kW
  • Area owned by: Industrial Consortium of Ulà Tirso (OR)
  • Type of investment (private, public, leasing, mortgage…): Private leasing
  • Kind of support given by by PP2: Support to the municipality for the administrative procedure and economic study, Support to the PV company for the redaction of Feasibility study.
  • Volume of investment: € 3.620.880,00
  • Key turned in the month of: 21/04/2011
  • Prevision of further RES investments around the area: Near the TERNA substation is during the link phase a PV Plant of 1 MW circa

In Greece, the main general results achieved during the action have been:
The triggering of 2 pilot PVPPs over landfills:

Thiva PVPP:
Location of the PVPP: Thiva, Greece
Peak power: 2 MWp
Area owned by: Private owner
Type of investment: Private investment in waste dump area financed by bank loan.
Kind of support given by your organization: Finalization of
Interconnection agreement with the utility (PPC – DEH in Greek)
Environmental permit
Construction licence
Installation permit
Volume of investment: 6.000.000 €
Key turned in the month of: May 2011

Volos PVPP:
Location of the PVPP: Volos, Greece
Peak power: 100 KWp
Area owned by: Private owner
Type of investment: Private investment in rocky industry area financed by bank loan.
Kind of support given by your organization: Finalization of;
Interconnection agreement with the utility (PPC – DEH in Greek)
Environmental permit
Construction licence
Installation permit
Volume of investment: 330.000 €
Key turned in the month of: April 2011

Moreover, it is essential to stress that in Greece project opened a whole new branch of potential investments, linked to the requalification through PVPPs over abandoned or abusive landfills and waste dumps (there are in great number in Greece) given the potential development of the PV market, sun conditions and FIT developments.
The benefits for the small municipalities in the near environment are very high. The citizens get a live example for green energy production in their municipality area. Furthermore local companies have taken part of the works during construction and jobs can be generated for the local operation and security of the photovoltaic park. Another important note is that in the past two years it has been observed, that operating PV systems in Greece produce about 10 to 15 higher output than the estimated values due to the fact that in the recent years the annually available solar radiation is higher than the values used from databases.